Wow. It looks much better!
Monday, July 21, 2008
Clean up
Everyone pitched in to clean up the house and prepare it for the next phase of construction. Sweeping, vacuuming with a shop vac, and picking up trash were all on the agenda for the morning.



Wow. It looks much better!
You might not be able to see it, but we were approved for electrical (yay!). Hope to hear about framing soon.
Wow. It looks much better!
Sunday, July 20, 2008
Doors are in!
Front Door:

Garage Door

Porch Doors (eventually they will be glass, these are called "dunnage" doors and they are temporary)
The front door looks pretty from the inside too. You can see the transom window has the same pattern in it.

Mechanical and plumbing have passed inspection. Electrical has a second inspection on Monday, and framing should be inspected Tuesday. Assuming they pass, insulation could start Wednesday or Thursday. After that is finished we can move into drywall!
Garage Door
Porch Doors (eventually they will be glass, these are called "dunnage" doors and they are temporary)
Mechanical and plumbing have passed inspection. Electrical has a second inspection on Monday, and framing should be inspected Tuesday. Assuming they pass, insulation could start Wednesday or Thursday. After that is finished we can move into drywall!
Subscribe to:
Posts (Atom)