We're almost finished with the plumbing, electrical, gas and hvac interior work. As soon as we pass inspections there, we can move on to insulation. I think 2 bath tubs will be installed this week, and the gas hookups should be put in place.
In the garage, the framers came back and boxed in the plumbing pipes and hvac duct work.
No comments:
Post a Comment